Turno
Turno integrationVacation rentalsCleaning scheduling and marketplace

AI cleaning inspection for Turno

RapidEye reads every cleaning image and checklist photo your cleaners upload to a Turno project, and returns a finding for each completed project before you would have opened the first picture.

What a completed Turno project holds

Overview

A Turno project already collects the evidence; what it does not do is look at it. Turno generates a cleaning project from each booking, the cleaner works it in the Turno for Cleaners app, checks off the checklist, fills in inventory, reports problems and adds cleaning images, and taps Complete Project. The host side then holds the checked items, the photos with their timestamps, a Certificate of Verification for those photos, and a quality control mark that a person sets by hand. Nothing in Turno reads the photos for what they show. RapidEye does: it takes the cleaning images and checklist photos from each completed project, together with the property, project type, date and teammate, and returns one finding per problem, with the earlier photo of the same spot beside the new one.

Every completed projectNot the ones you have time to open in the schedule. Each project that reaches Completed has its images read, on every property you connect.
Item photos judged against the guiding imageYou attached a staging photo to the item and required a photo to check it off. RapidEye compares the two and says where they differ.
Quality control with something behind itTurno's Pass or Fail mark is yours to set. RapidEye hands you the evidence for it, project by project.

How it works with Turno

Turno organises the turnover as a project with parts the cleaner fills in after tapping start: the checklist, the inventory, problem reports, notes and cleaning images. Each part is a place a photo can land, and each photo is something RapidEye reads once the project is completed.

  • Checklist items with require photo documentation. These are the richest input Turno produces, because every photo arrives labelled with the item it was taken for and, if you added one, the guiding image of how that spot should look. RapidEye reads the item photo against both the guiding image and the last photo of the same item at that property. A hypothetical example: the item "Stage living room, remotes on the console" is checked off with a photo, and the finding that comes back is that the throw is missing from the sofa and the console holds one remote where the guiding image shows two.
  • Cleaning images added to the project itself. Turno's cleaner guidance suggests adding pictures of the work to every project, and many teams upload a general set from each room rather than item by item. RapidEye reads these as a walkthrough: a new stain on the bedroom carpet, a scorch mark on the kitchen counter, a door that no longer sits flush, each returned with the earlier photo of the same spot so you can see when it changed.
  • The rooms that have no photo at all. A module in the checklist with items checked but no photo behind them, or a set of cleaning images that never enters the second bathroom, is itself a finding. The most common way a missed room stays hidden is that nobody photographs it, and RapidEye tells you which room that was.
  • Problem reports and their photos. When a cleaner reports a property problem with photos, Turno notifies you. RapidEye reads those photos too, and adds what the report did not say: whether the damage appears in earlier projects at that property (so it predates this guest) or shows up for the first time in this one.
  • Inventory counts, checked against the picture. Turno's inventory is a number or a level the cleaner types in, precise or estimate. Where a checklist item photo shows the linen closet or the coffee station, RapidEye compares what is visible with what was reported, and flags the shelf that reads full in the count and empty in the photo.
  • Inspection projects, if you run them. Turno can generate an inspection project alongside every cleaning project for a property, assigned to a teammate with the inspection role. Those carry their own checklist and photos, and RapidEye reads them the same way, so the inspector's set and the cleaner's set are checked against each other.

Each finding names the property, the room or spot, the kind of problem, a severity, the earlier and current photos, and a suggested next step. It lands in the RapidEye dashboard and, if you want, in a Slack channel or an inbox. Turno stays the record: RapidEye does not check items, mark quality control, assign problems or touch payments. Whether a Fail goes on the project, a property problem gets created, or a maintenance project goes to a teammate is your decision. If your team documents turnovers differently, with video walkthroughs, an inspection format of your own, or photos that live outside Turno, that is something we set up with you rather than a limit of the product.

How to connect Turno to RapidEye

  1. A Turno host account with cleaning projects. Your properties generate cleaning projects from the synced booking calendar, with the teammates who clean them added to each property. RapidEye covers the properties you choose; a property you leave out is not read.
  2. Photos on the project. Your cleaners already add cleaning images in the Turno for Cleaners app, and any checklist item with require photo documentation switched on carries a photo per item. Those are what RapidEye reads. If a property has no photo history yet, RapidEye can supply a capture link that opens on any phone, no app to install, until the Turno photos build up.
  3. Invite RapidEye as a co-host. Under My Team in Turno, open the Co-hosts tab and invite support@rapideyeinspections.com with the Co-host role, selecting the properties to cover. The Connect button above has the exact details. We accept the invite and email you when the first findings are ready.

What a completed Turno project holds, and what each part can prove

Checked against Turno's help centre, September 2026.

Turno is a cleaning scheduling platform and cleaner marketplace for short-term rentals, with a Turno for Hosts app and a Turno for Cleaners app. According to Turno's help centre documentation (turno.com), a project is created from a booking or by hand, offered to the property's primary teammates first and its backups after, and once accepted appears on the cleaner's schedule. Starting it cannot be undone. Only after the cleaner taps start do the checklist and inventory appear, along with the options to report a problem, leave a note and add cleaning images. Completing the project confirms it on both apps and, for marketplace and auto-pay connections, triggers payment. The card below is what you see when you open that completed project's details from the Schedule or Project List, part by part.

Project details Cleaning, completed
Same-day arrivalMandatory checklist
PartWhat Turno recordsWhat it can tell you on its own
TimesRequested start and end, then the actual start and end the teammate logged. Hourly projects ask for a reason if the times are edited.How long the cleaner was inside. Not what they did there.
History of actionsWho accepted, started and completed the project, and when.That the project moved through its steps.
ChecklistModules (rooms, typically) with items the cleaner checked off. Items can carry a guiding image, require a note, or require a photo before they can be ticked. A Mandatory tag means every item must be checked before Complete Project is available.That each item was ticked. A required photo proves a photo was taken of something; it does not judge what is in it.
Cleaning imagesPhotos and videos added to the project or to checklist items, each time-stamped, with a Download all images link and a Certificate of Verification PDF listing every photo with its timestamp, the property alias, project date, cleaner's name and Project ID.Everything, if a person opens each one. This is what RapidEye reads, on every project.
InventoryA count (precise) or a level such as high, medium or low (estimate) per item, entered only by the cleaner, with a threshold that raises a problem report when stock runs low. Can be made mandatory before completion.What the cleaner typed. Nothing confirms it against the shelf.
Unresolved problemsProperty problems reported from the app with a title, a description of up to 500 characters and photos, listed as Unresolved, Assigned or Solved, and assignable to a maintenance project or to someone outside Turno by SMS or email.What the cleaner chose to report. Damage nobody noticed is not here.
Notes and locationNotes from the cleaner, your private notes, notes to the teammate, and the teammate's location at completion if they allow it.Where they were and what they wrote.
Quality controlAn optional Pass or Fail you or a co-host set after completion. For record only: the teammate is notified, and payment is unaffected.Your verdict, if you had time to form one. Usually set without the photos being opened.

Parts of the project details panel as documented by Turno. The shaded row is the one RapidEye works from.

The marks Turno puts on a project

On the host Schedule, Turno shows a project's state as icons on its bubble. The ones that matter for condition are set by people: In progress and Completed by the cleaner, the quality control shields by you, the problem triangle by whoever reported it.

In progress cleaner tapped start Completed cleaner marked complete Quality control Pass set by host Quality control Fail set by host Problem report unresolved Same-day arrival next check-in today

A selection of the schedule icons documented in Turno's help centre; the colours on the shields and the triangle are Turno's own meanings, not decoration.

Does Turno review the photos, or just store them?

It stores them, and stores them well. Turno's checklist article documents the require photo documentation option, its project report article documents where cleaning images appear and how to download them, its schedule article lists images among the project details, and the Certificate of Verification proves each photo's timestamp for a dispute on a booking platform. The Quality Center goes a step further for Airbnb-integrated hosts, tying guest cleanliness ratings to the cleaner who did each project, which tells you after the review lands which cleaner it lands on. None of those pages describes Turno, or anyone at Turno, looking inside a photo to say whether the counter is clean, the lamp is where the guiding image put it, or the sofa has a new burn. The quality control setting is explicit that it is for record only, and the spreadsheet project reports do not include checklist data at all. So a Completed project in Turno with forty photos on it is a well-documented statement by the cleaner. RapidEye is the part that opens the forty photos, every time, and tells you what they show.

Turno integration FAQ

Does RapidEye integrate with Turno?

Yes. RapidEye reads the cleaning images and checklist photos your cleaners upload to Turno projects, along with the property, project type, project date and assigned teammate, and returns one finding per issue: new damage, a missed clean, a missing item or a maintenance problem, with the earlier photo of the same spot beside the new one. Your Turno projects, checklists, inventory, problem reports, payments and quality control marks are not changed.

Does Turno check the photos my cleaner uploads?

Turno stores them and proves when they were taken. The project details show cleaning images and checklist photos, there is a Download all images link, and a Certificate of Verification lists each photo with its timestamp. Nothing in Turno's help centre describes the platform looking inside the photos to judge the clean. That review is what RapidEye adds.

Can RapidEye use Turno's require photo documentation setting?

Yes, and it is the best way to run the integration. When an item has require photo documentation on, the cleaner has to upload a photo before it can be checked off, so every completed project carries a photo per item you care about. RapidEye reads those item photos against the earlier ones of the same spot and against the guiding image you attached to the item.

Does RapidEye mark quality control Pass or Fail in Turno?

No. Turno's quality control setting is a mark you or a co-host set after the project is completed, and RapidEye writes nothing to Turno. Findings arrive in the RapidEye dashboard, and in Slack or an inbox when your team prefers to be nudged there. Whether the project gets a Pass, a Fail, a property problem or a maintenance project is your call.

Do I need Turno inspection projects to use RapidEye?

No. Turno can generate an inspection project for every cleaning project, assigned to a teammate with the inspection role, and if you run them RapidEye reads their photos too. Most operators connect RapidEye to the cleaning projects themselves, so every completed clean gets checked whether or not a second person goes to the property.

What if my cleaners upload photos to the project rather than to checklist items?

RapidEye reads both. Turno keeps photos added to the project itself under cleaning images and photos added to individual checklist items with those items, and the project details show both. Photos attached to items come with a label of what they are meant to show, which makes findings more specific, but a set of general cleaning images from a walk through the property works.

Other cleaning operations platforms RapidEye works with

Each of these hands the cleaner a job on a phone and collects photos or issue reports against it; RapidEye reads whatever the job collects.

DoinnCleaning and maintenance jobs created from PMS bookings, with instructions, mandatory fields and photos carrying uneditable date and time stamps.
Operto TeamsHousekeeping, inventory and maintenance coordinated in one place for vacation rental operators, with photo and video reporting from the team.
ResortCleaningHousekeeping, inspection and maintenance scheduling for vacation rentals and cleaning companies, integrated with the customer's PMS.
TIDYCleaning and maintenance jobs for property managers and Airbnb hosts, tracked room by room with issues reported as they are found.
All vacation rental integrations

Sources

  • Turno help centre, project completion, checklist editor, project settings, project reports, schedule page, schedule icons, inventory, property problems, inspection and maintenance projects, project types, teammate and co-host invitation and permissions documentation; Turno product pages, features, photo checklists, problem reporting, inventory management and Quality Centerturno.com
  • Doinn product pages, property operations platformdoinn.co
  • Operto product pages, Operto Teamsoperto.com
  • ResortCleaning product pages, housekeeping softwareresortcleaning.com
  • TIDY product pages, property managerstidy.com

Sources are named at the publisher level and were checked against the publisher's live pages before this page was published.