Trail
Trail integrationRestaurantsOperations platform

AI condition checks for Trail

Read every photo your teams attach to Trail tasks, record logs and comments, and get a finding per site for what the pictures show but the checklist cannot.

How a Trail task records evidence

Overview

Trail is unusually serious about photo evidence, and that evidence is exactly what nobody has time to look at. A task can be blocked from completion until a photo is attached, and mobile devices can be restricted to the camera so the image is taken there and then rather than pulled from a library. So the pictures arrive, time and date stamped, tied to a site and a day, and they sit in the record. RapidEye reads them: every photo on every completed task, across every site, back as one finding per problem with the two shots that show it.

Fresh photos, readCamera-only capture means the picture is from today, so a comparison against yesterday means something.
Sites ranked by conditionAlongside the score for completing on time, a ranking of what the sites actually looked like.
Trail stays the recordNo task, schedule, record log, score or approval is changed. RapidEye reads and reports back.

How it works with Trail

Trail groups the day into published tasks assigned to sites, so the checks follow the tasks a team already opens rather than a separate inspection round. These are examples, not the boundary: RapidEye reads whatever documentation a team produces, photos, video walkthroughs or 3D scans, and reports against the standard you set.

  • Opening checks. The photo on a bar setup or a floor check is the first honest look at the site that day. RapidEye names what is off: chairs still stacked in shot, a smeared glass door, a bin left by the fire exit.
  • Cleaning and closing checks. Tonight's kitchen photo against the same angle from the nights it was done properly, so a prep bench that has been quietly slipping for two weeks becomes a finding rather than a feeling.
  • Record logs. A file or photo field in a record log sits next to the readings. The number tells you the fridge is at temperature; the picture tells you the seal is perished and the shelf below it is not clean.
  • Delivery checks. Crates on the pass, damaged packaging, a short case: what the driver left, in a photo, matched to the day and the site so a credit claim has something behind it.
  • Maintenance logs and corrective actions. When a team raises a corrective action from a task, the photos before and after become a dated record of whether the fix actually happened.

A finding is one problem: where it is, what kind it is, how bad it looks, the photos that prove it, and a next step. It shows up in the RapidEye dashboard, with Slack or an inbox as optional stops. What you do inside Trail is yours: reopen the task, raise a corrective action, or put it on the area visit list. If your sites, your capture format or the standard you are checking against is not one of these, that is a conversation we have at setup, not a wall.

How to connect Trail to RapidEye

  1. The sites and tasks to read. Name the published tasks that matter for condition: opening and closing checks, cleaning schedules, delivery checks, audits, maintenance logs.
  2. Photo evidence turned on. Trail's forced photo and file comments setting stops those tasks being completed without a picture, and restricting to camera only on mobile keeps the picture current. If a task has no photo today, RapidEye can send a capture link that opens on any phone with nothing to install.
  3. A Trail user for RapidEye. Add Rapid Eye under Users as a new Manager-level user with site access to the sites you want read; Managers can be assigned to any combination of sites or groups. The modal has the details.

How a Trail task records evidence

Checked against Trail's help centre, September 2026.

Trail is work management software for hospitality and leisure, used in restaurants, hotels, pubs, bars, cafes, bakeries, retail, schools, gyms and spas, from single sites to franchise groups. Tasks are built in the task editor, sit in one of three states, Draft, Published or Archived, and are assigned to sites and to roles; teams work them from the Complete Tasks page. According to Trail's help centre documentation (trailapp.com), a photo or file can reach a task in three places, and one setting decides how honest the picture is.

  1. The comments boxAttach a file or photo to a task as evidence, with or without a comment. On a phone you either upload from the library or take the photo right then with the camera icon.
  2. Inline commentsThe same attachment, but inside the task next to the item it belongs to, so the picture is attached to the thing it shows. A Standard Plan feature.
  3. A record log file or photo fieldPhoto evidence as a field of the log itself, sitting beside the readings and the options, and it can be set as a mandatory field.
  4. Camera only, on all threeRestrict to camera only on mobile devices removes the library as an option, so teams add a new image every time it is requested. Trail's own reason for it, in its own words.

Around that sit the controls that make the evidence usable: forced photo and file attachments block a task from being marked done until something is attached, corrective actions can be requested or required when an answer is out of range, sign-off puts a completed task into a Pending approval state until a manager approves it, and an approved task carries a second timestamp under the completed one saying who approved it and when. Admins and Managers can approve by default, custom roles can be granted the permission, and a PIN code can be used to approve on the spot.

What a Trail site score measures, and what it does not

Timing, deliberately. Trail's scores are calculated from completion: ten points for a task completed on time, five for late, zero for incomplete, totalled and divided by the number of tasks for an average out of ten, per site and per area, with an organisation average and a 30 day trend on top.

10pts

Completed on time. The task was done and closed inside its window.

5pts

Completed late. Done, past the due time.

0pts

Incomplete. Trail scores at the end of the business day, so an unsynced task counts as missed and is not recalculated.

That is a fair and legible measure of whether the day was run, and it is what a multi-site operator gets on the daily digest. It is not a measure of what the sites looked like: a site can score 9.8 every week with a photo of a prep bench nobody has examined since March. The photos to answer that are already in the record, tied to the site and the day. RapidEye reads them and gives the operator the second number, condition, next to the one Trail already gives them.

Trail integration FAQ

Does RapidEye integrate with Trail?

Yes. RapidEye reads the photos and files your teams attach to Trail tasks, record log fields, comments and inline comments, together with the site, the task and the day they were completed, and returns a finding for each problem visible in them. Your tasks, schedules, record logs, scores and approvals in Trail are untouched.

Does Trail let you require a photo on a task?

Yes. Trail's forced photo and file attachment setting stops a task being marked done until a photo or file is attached, and a separate setting restricts mobile devices to the camera only, so a team member cannot pull an old image out of the phone library. Trail makes sure the picture is new. RapidEye is what reads it.

Where do the photos live in Trail?

In three places, all of which RapidEye reads: the comments box on a task, inline comments inside a task on the Standard Plan, and a file or photo field in a record log. A team member can attach from the device or take the picture there and then with the camera icon.

How does this sit with Trail site scores?

Alongside them, measuring a different thing. A Trail site score is completion timing: ten points for on time, five for late, zero for incomplete, averaged out of ten across the day's tasks. RapidEye scores what the photos from that same day show, so a site at 9.8 that keeps sending back a dirty prep bench is visible instead of invisible.

Will RapidEye change tasks, record logs or approvals in Trail?

No. Trail stays the boss of the day. Task statuses, schedules, sign-off, corrective actions and the audit history are yours; RapidEye reads and reports, and the manager decides whether to reopen a task or raise a corrective action.

We run 25 sites across two brands on Trail. Where does this pay off?

In the gap between the daily digest and the next area visit. The compliance record is already solid; what an area manager cannot do is look at every opening check across 25 sites. RapidEye reads all of them and returns the exceptions by site, so the visit goes to the site the pictures say needs it.

Other hospitality operations platforms RapidEye reads

Systems where a site's day already produces checks, logs and photos.

Sources

  • Trail help centre, task, record log, photo attachment, approval, scoring and permissions documentationtrailapp.com
  • Trail product pages, hospitality work management and industries servedtrailapp.com

Sources are named at the publisher level and were checked against the publisher's live pages before this page was published.